Start with the smallest read-only diagnostic that owns the problem. Preserve files, journals, branches, and worktrees until Cadre has reconciled them.
The cadre-ai Command Is Missing
npm install -g cadre-ai
cadre-ai --version
cadre-ai doctorThe executable is cadre-ai, not cadre. doctor verifies the packaged CLI,
MCP runtime, manifests, skills, and templates.
The Plugin Is Missing Or Stale
cadre-ai install
codex plugin list --json
claude plugin list --jsonThen start a new Codex conversation or run /reload-plugins in Claude Code.
For Zed, run workspace: reload from the command palette, then open a new
Agent thread and inspect AI → Skills and AI → MCP Servers.
Use --target codex, --target claude, --target zed, or --target all to
remove auto-detection ambiguity.
If another marketplace named cadre points elsewhere, review the path and rerun
with --replace-marketplace only when replacement is intended.
Claude Still Prompts Or Does Not Start Cadre MCP
Rerun cadre-ai install --target claude. The installer should preserve
unrelated JSONC settings while ensuring both:
cadreis present inenabledMcpjsonServers;mcp__cadre__*is present inpermissions.allow.
If permissions.deny blocks Cadre tools, installation stops rather than
overriding the deny rule. Remove or narrow the conflicting rule deliberately.
Zed Skills Or MCP Are Missing
Rerun cadre-ai install --target zed. Cadre refuses to replace any existing
~/.agents/skills/cadre-* path that it does not own. Move or rename the
conflicting skill deliberately, then retry. In ~/.config/zed/settings.json,
confirm context_servers.cadre points to the packaged cadre-mcp.mjs; the
installer preserves unrelated JSONC settings and refuses to replace a
different server already named cadre.
After an update, an already-open Zed workspace can show an empty skill list
while the links on disk are valid. Run workspace: reload to refresh discovery,
then confirm all ten cadre-* skills and the active server.
Cadre MCP Is Unavailable
Confirm cadre-ai doctor, native plugin listings, and client reload first.
Stateful workflows require the installed MCP runtime and must stop rather than
reconstructing templates or state logic from memory. wisp is the only
workflow that can remain a stateless exploration without MCP.
Cadre Finds The Wrong Project
Run Git root discovery from the intended directory:
git rev-parse --show-toplevelCadre rejects filesystem roots and home directories. create never initializes
a nested repository when an enclosing worktree exists. If the repository
boundary is materially ambiguous, choose it explicitly before approval.
Create Finds Existing State
If .cadre/project.json exists, create resumes its setup checkpoint. It does
not overwrite or reinitialize the project. Use status to inspect the current
operation, then continue create or use refresh after setup is complete.
A Workflow Reports A Journal Mismatch
Inspect the reported files, Git status, HEAD, branches, commits, and worktrees. Do not delete the journal or reset the repository.
Common legitimate recovery cases are:
- approved files are dirty and ready for their expected commit;
- the expected receipt commit exists and needs reconciliation;
- promoted artifacts and their receipt await the original operation's one commit;
- a worker commit or merge exists but its node transition is not recorded.
Anything else requires a deliberate reconciliation decision.
Cadre 4.0 preserves the reviewed product HEAD across bookkeeping commits and recognizes already committed receipts. Upgrade the installed integration if implementation/review keeps requesting another bookkeeping commit. Resume the existing track and reconcile its original operation receipt; keep the verified product HEAD and approval evidence. Replaying a committed operation should return the original receipt with zero changes. Do not reset the repository or create a new receipt merely to record the previous commit's SHA.
Autonomous Stops After A Revision
A committed revision record and a reconciled receipt do not prove that the
approved manifest included the matching state and execution transition.
Compare the record's revision numbers, canonical state, spec/plan references,
Autonomous scope reference, and the original receipt manifest. Reconcile that
receipt once; repeated reconciliation cannot supply missing approved fields.
Preserve the journals and Git evidence and prepare an explicitly approved
revise/refresh repair. Do not clear the operation, rewrite the journal graph,
or change Autonomous authority by hand. Keep the old revision record immutable
and use a fresh repair artifact. If the active journal and canonical graph
differ, the repair must name the journal's original graph digest and reachable
plan commit under Recovery evidence; the runtime verifies that committed
baseline before proposing supersession.
Cadre requires the complete revision state and record before approval. At a safe boundary it includes the old execution as superseded history and starts a new execution for the revised graph, retaining modes and completed work. This behavior fixes the active-revision gap in 3.9.1. Update both the global CLI and installed integrations, then start a fresh client session. An already broken track still requires the explicitly approved repair described above.
Revise Or Refresh Stops After Worker Cleanup
Completed journals retain worker branch names and paths, including provenance carried into later executions. Cadre checks registered worktrees, remaining directories, and actual Git branches instead of treating those historical strings as active workers. Finish supported cleanup of integrated workers before preparing a revision or refresh; preserve the journal evidence. A remaining worker branch, orphaned directory, or unsafe symlink still blocks promotion.
A receipt-based refresh that changes active scope must include one fresh revision record per affected track, proposed state with the next track revision, a reassessed plan, and synchronized learning/dependency context. Keep authored execution and Autonomous authority fields unchanged; the runtime previews their resulting transition within the same approval. Context-only refresh retains counters and current scope authority. Complete legacy contract/policy migration first, then prepare a separate scope proposal if needed. Unsupported formats use the 3.9.0 bridge first; compatible 3.9.x/v5 projects need no version-only refresh.
Resume Reports OPERATION_INPUT_DRIFT
The pending operation's unchanged pattern, dependency or context inputs differ from the exact approved fingerprints. Resume stops before further promotion and keeps its original journal and approval. Preserve the changed files and inspect the reported paths. Deliberately restore the approved inputs, or obtain an exact repair approval; do not replace the journal, change its hashes, or repeat product work. A committed operation still replays without changes after later guidance updates. Recovery fingerprints live in temporary state; published receipts remain unchanged. Older pending receipts check fingerprints retained in proposed artifacts.
Refresh Rejects Authored Autonomous Authority
Context refresh retains the entire original loop: authorization, cumulative review baseline, findings, recorded attempts and blockers. Keep these fields unchanged in staged state. Use the review/revision procedures for their permitted lifecycle changes, and the explicit legacy policy migration for an old execution's first Autonomous authority. Changing context is not permission to shorten the review range or remove a finding attempt.
Revising An Imported Draft Specification
An imported track at drafting-plan can revise its already approved specification
without approving the unfinished plan. Include next track/spec/draft-plan counters,
a fresh revision record, and reassessed plan/learning/dependency context. Preserve
authored commit references and keep status drafting-plan; the runtime records the
old specification approval and leaves commits.plan null. The approved baseline
comes from the reachable specification commit, even when requested edits are
already present on disk. An initial draft that
has no plan uses previous plan revision 0. Resume track planning and obtain plan
approval before implementation. Draft-plan-only edits remain in the track flow.
Plan Graph Validation Fails
Check that:
- every regular phase explicitly declares its phase dependencies;
- every regular task explicitly declares same-phase task dependencies;
- references exist and the graph is acyclic;
- each phase ends with exactly one derived
User Manual Verificationbarrier; - the final track-level verification phase contains only its manual task and depends on every delivery phase;
- completed tasks contain reachable commit provenance appropriate to state.
Update the proposal and rerun graph validation before seeking approval.
Implementation Is Not Spawning Workers
Parallel mode creates workers only when at least two safe nodes are ready. One ready node executes in main. Also inspect:
- incomplete declared track dependencies;
- phase/task dependencies;
- active or conflicted nodes;
- the workflow worker bound and host capacity;
- whether a phase has an active phase-worker lease that must reach a clean handoff before task-worker fan-out.
The generated workflow defaults to three delegated workers, while the runtime
accepts maxWorkers values from 1 through 32. A higher value does not create
workers when the host exposes fewer child slots or the DAG has fewer safe ready
nodes. A retained worktree is not necessarily an active worker slot.
This is expected scheduling behavior, not necessarily a failure.
Integration Or Cleanup Is Refused
Integration requires clean source and target worktrees and unchanged branch evidence. Cleanup additionally requires that ancestry prove the branch is fully integrated.
Resolve task conflicts in the phase worktree and phase conflicts in the canonical worktree. Rerun combined verification and obtain approval before recording the merge. Never force cleanup or branch deletion.
Review Cannot Complete A Track
Review requires ready_for_review, a current completed execution, a matching
plan revision and graph digest, a reviewed HEAD, and clean centralized
validation. Approved actionable findings return the track to implementation.
Only explicit clean-completion approval can mark it completed. Non-Autonomous
modes can record explicitly accepted risks; Autonomous cannot waive findings.
Archive Rejects A Batch
Every selected track must already be completed with a clean review bound to its current execution and plan. One ineligible track rejects the whole batch. Fix or remove that selection and prepare the complete batch again.
Source Checkout Validation Fails
From the repository root:
pnpm install --frozen-lockfile
pnpm --filter cadre-ai check
pnpm --filter cadre-ai test
pnpm --filter cadre-ai validateEdit TypeScript sources, workflow skill files, agents, templates, manifests,
and marketplace catalogs. Do not edit ignored harness/dist/ bundles as source.
Older Project Format Warning
PROJECT_UPGRADE_REQUIRED leaves project files unchanged. Use npm install -g cadre-ai@3.9.0, then cadre-ai install --target all --scope user and reload the client. Reconcile interrupted operations and perform the explicitly approved refresh to schema-2/v5 in 3.9.0. After that succeeds, install 4.0.0, reinstall the client integration and reload again. Compatible 3.9.0/3.9.1/3.9.2 schema-2/v5 projects do not need this bridge or a version-only refresh. Never fix the warning by changing version labels or deleting pending approval evidence.